Full Kitchen Remodels Across the Wasatch Front

A full remodel means the room comes apart. Cabinets, counters, flooring, lighting and usually the sink and range all come out, and what goes back is built around how you actually cook rather than what happened to be there when the house was built. It is the most disruptive version of this project and the one where sequencing matters most, because every stage waits on the one before it and a decision made late holds up everything downstream.

Scope is the first thing to settle. Staying inside the existing footprint keeps the trades simpler. Moving plumbing or gas, opening a wall or adding an island changes what has to happen before anything pretty goes in, and it usually brings permits and inspections into the schedule. Neither version is wrong. They are just different projects, and knowing which one you are signing up for before quotes come in keeps the whole conversation honest.

What a full kitchen remodel actually includes

  • Demolition and discovery. Cabinets, counters, flooring and fixtures come out. This is also when older homes show what is really behind the walls, and when scope decisions get made fastest.
  • Plumbing, electrical and gas rough-in. Supply and drain lines, circuits, receptacles, lighting boxes and any gas work get set while the walls are open, then inspected before anything is covered.
  • Drywall, paint prep and flooring. Walls get closed and finished, and flooring goes in or gets protected, depending on whether it runs under the cabinets or stops at the cabinet run.
  • Cabinet delivery and installation. Boxes are set level, scribed to walls that are rarely square, then fastened. Nothing downstream can start until this stage is both complete and accurate.
  • Countertop template and install. Counters are measured off the installed cabinets, fabricated off site, then delivered and set. The sink, faucet and disposal are connected after that.
  • Backsplash, trim and punch list. Tile, filler pieces, toe kick, hardware, appliance hookup and the long tail of small corrections that make a kitchen feel finished rather than nearly finished.

How a full remodel moves from decisions to a finished room

  1. Lock the plan. Layout, appliance sizes and cabinet level get settled first. Appliance dimensions in particular have to be final, because cabinet openings are built to them and changing later means rebuilding.
  2. Order the long-lead items. Cabinets are ordered and the clock starts. Countertop material, tile, lighting and plumbing fixtures get selected during this window so that nothing stalls the installation later.
  3. Demo and rough-in. The room comes out, the trades work with the walls open, and inspections happen where permits require them. Surprises surface here, so keep a contingency and a decision maker available.
  4. Install in order. Drywall, paint, floors, cabinets, then the countertop template and its unavoidable pause, then counters, backsplash, hookups and punch list. Skipping ahead in that order creates rework.

What it costs

We do not quote, and any number you see before a walkthrough is a guess. What moves a full remodel bid is fairly predictable: the cabinetry level you choose and how much of it there is, whether plumbing or gas relocates, what countertop material you land on and how many seams and cutouts it needs, whether appliances are being replaced and how they are vented, and the condition of the wiring, plumbing and framing behind the walls. Add the flooring decision and any structural change, and you have most of the bid.

Questions people ask

Should I move the layout or stay in the existing footprint?

It depends on what is actually bothering you. If the problem is worn finishes and dead storage, staying in the footprint solves it with far less involvement. If the problem is that the sink faces a blank wall, the range crowds a doorway, or two people cannot be in the room at once, moving fixtures is the only real fix, and that pulls in plumbing, electrical, venting and usually permits.

What holds up a kitchen remodel most often?

Cabinets and decisions. Cabinet lead time drives the schedule because nothing installs before they arrive, and any change to the layout or appliance sizes resets that clock. After cabinets, the countertop template creates a built-in pause while the tops are fabricated. Most delays trace back to a selection made late rather than to a crew working slowly.

What happens if they find something behind the walls?

In older Utah homes it is common. Undersized wiring, galvanized supply lines, drain runs that were never quite right, or framing a previous owner modified all show up once things are open. None of it is a disaster, but it is real work that was not in the original scope, so agree in advance how changes get priced and who approves them.

Do we have to move out of the house?

Most households do not, but the kitchen is unusable for a meaningful stretch, including the gap between cabinet installation and countertop delivery. Plan a temporary setup elsewhere with a refrigerator, a microwave and access to a sink, and think through dust, pets and where people will eat before demolition day rather than after it.

Get Help With This

Takes about a minute. No obligation.

We will call you back at the number you give us. Your details go to us and to the provider we match you with, and nowhere else.

Also Available

Other services

Cabinets & Refacing

Cabinets are usually the largest single line in a kitchen, and their lead time sets the schedule for everything else. We help you sort out whether new boxes, semi-custom, custom or refacing the ones you have makes sense here.

Learn more →

Countertops & Backsplash

New tops and a backsplash change a kitchen faster than almost anything. Counters get templated after cabinets are set, so the order of operations matters more here than people expect, and material choice shapes both look and upkeep.

Learn more →

Layout & Island Changes

Moving a sink, adding an island or opening a wall changes what is behind the drywall. Plumbing, gas, electrical and sometimes structure all come into it, which is exactly what separates this from a cosmetic update.

Learn more →